Website: Long International
Date Published: 2022
Type of material: pdf & webpage
URL: https://www.long-intl.com/articles/cost-schedule-risk-analysis/
Overview:
This paper by Dr David Hulett, renowned risk subject matter expert and Andrew Avalon of Long International, looks at the advantages of conducting an integrated Cost & Schedule probabilistic analysis instead the standalone analyses that are prevalent on projects considering that cost and schedule are intertwined.