How to remove gaps after data date for activities in progress in Primavera P6
Do you have gaps on activity bars after the data date for activities that are in progress in Primavera P6? Get rid of the gaps with this quick tip.
How to stop Microsoft Project progress bar extending beyond status date
Here is a workaround that will ensure that your progress bars are always left of the status date line.
How to Prepare a Schedule Logic Report in Primavera P6
Is your project team struggling to follow the logic of your Primavera P6 schedule? Learn how to produce a schedule logic report that lists predecessors, their dates, relationship types, lags & driving status.
How to Export Microsoft Project Data to Excel for Analysis
If you have ever used Primavera P6, you would be surprised that exporting from Microsoft Project to Excel does not provide you with a ready to use data.
EPC Schedule Levels
Schedule levels refer to the details of activities in an issued schedule and should not be confused with the physical level of a schedule.
10 People to follow on LinkedIn & Planning Planet in 2020
LinkedIn and Planning Planet are two of my favourite websites and here is a list of 10 people I follow on LinkedIn or look out for their posts on Planning Planet. Reading from these people always makes my day.
How to Display P6 Durations in Both Hours & Days
This tutorial outlines the steps required to display two different units of durations in a Primavera P6 schedule.
How to Trace Driving Logic in Microsoft Project 2010
Find out how to trace the driving relationship logic between activities in a Microsoft Project schedule just as you would in Primavera P6
9 Project Planning Blogs to Follow
This post is about other blogs that I visit and would recommend that you also visit as these blogs provide rich Project Planning and Scheduling contents.
Your P6 Actual Duration is Wrong and This is How to Fix It
When recording actuals or as-built details in Primavera P6, if the proper settings are not in place, you might be recording the wrong actual duration.
P6 Multilevel Activity Codes Tips
P6 allows us to nest activity code values into sub-levels but while there might be reasons to want to use activity codes nesting feature, I'm not a fan as nesting introduces WBS type rigidity to activity codes.
My Settings #06: P6 Schedule Review
Are you looking for steps to follow when reviewing a Primavera P6 schedule, then this post is for you.
Project 2010 Activity Statistics Summary Schedule
Unlike P6, Microsoft Project 2010 does not have inbuilt Number of Activities fields, so this tip shows a workaround.
P6 Activity Statistics Summary Schedule
This quick tip shows how you can set-up a schedule layout in Primavera P6 to display different number of activity statistics for each WBS element and invariably for the whole project.
Junior Planner or Scheduler: 5 Things You Might Not Have Been Told
Are you just starting out as a Junior Planner or Scheduler? Then here are 5 things to consider.
Sorting by Start Dates in P6
Sorting by start dates in Primavera P6 is quite easy but there are times when two activities with same start dates but different finish dates are not sorted in the desired order.
My Settings #05: Schedule Roll-up in Microsoft Excel
This post is about an easy and cost effective way to prepare a simple but very effective one-page summary schedule that will always grab a manager's attention as it can fit into a presentation slide.
My Settings #04: Schedule Roll-up in Microsoft Project & P6
This post is about how I set-up my Microsoft Project 2010 and Primavera P6 v16.1 so that my summary schedules present more meaningful information.